WHY CHOOSE US?SERVICESPROJECTS

PROJECTS

SERVICES

WHY CHOOSE US?

CONTACT




SERVICES


Nothing is more frustrating than having confusion in the field during construction while under a time constraint. This leads to change orders and cost overrun. ALR is the perfect design team to create trouble free plans. The Team is ready to fulfill any contract through our knowledge of engineering technologies. The service provided will be nothing but the best!.


COMMERCIAL

Commercial subdivisions, strip malls, commercial lots, warehouses, retail stores, churches, restaurants, etc...<br> Cover Sheet: General information about the project, the owner, legal discretions, basis of bearing, basis of elevation, location map, general notes, legends .<br>Development Plan: Key notes, information of site construction methods, parking spaces .<br>Grading: Earthwork quantities, spot elevations, Finish Grade.<br> Details: Construction details, trash enclosure, handicap parking, cross-section, pond details, retaining wall details, hydraulic structure details, etc. .<br> Horizontal: General horizontal control or site related items and location of main building..<br> Drainage Report (Hydrology): Watershed delineation, water run-off calculation, detention/retention calculations, hydraulic calculations, scour calculations, float pain delineation, etc..<br> Sewer Plans: design sewer lines according to the corresponding jurisdiction.<br> Sewer Reports: hydraulic design of sewer lines.<br> Water Plans: design of water lines according to the corresponding jurisdiction.<br> Structural: retaining walls, foundations, restrained walls, beams, columns, connections..<br>

RESIDENTIAL (5 LOTS +)

Tentative Plat: Preliminary set of plans to show the proper jurisdiction the subdivision development plans<br> Water Plan: design of water lines according to the corresponding jurisdiction<br> Sewer Plan: design sewer lines according to the corresponding jurisdiction<br> Sewer Reports: hydraulic design of sewer lines<br> Paving - Grading Plan: Design of roads required for the subdivision, grading the roads and the lots<br> SWPPP Report & Plan: Storm Water Pollution Prevention Plan<br> Drainage Report (Hydrology): Watershed delineation, water run-off calculation, detention/retention calculations, hydraulic calculations, scour calculations, float pain delineation, etc.<br> Structural: retaining walls

SINGLE RESIDENCE

Site Plans: Key notes, information of site construction methods, parking spaces<br> Grading: Earthwork quantities, spot elevations, Finish Grade<br> Structural: retaining walls, foundations, restrained walls, beams, columns, connections.<br> Drainage Report (Hydrology): Watershed delineation, water run-off calculation, detention/retention calculations, hydraulic calculations, scour calculations, float pain delineation, etc.<br> Certificates of Elevation: Upon site development completion and during construction, this certifies no future flooding issues in the lot<br> As-Built Certification Document: For jurisdictions that require it, this certifies the proper construction of the site according to plans<br> Framing/Structural Plans: Design of the structures, columns, beams, etc...<br> Foundation Plans: Design of the footing for the residence.<br> Water Plan: design of water lines according to the corresponding jurisdiction<br> Sewer Plan: design sewer lines according to the corresponding jurisdiction



We Value Our Clients

People First


Timeliness


Integrity


Delivery


;

We Are Always Ready To Help!


Your Commercial & Residential Real Estate deserves to be dealt with by professionals who understand the value of your Real Estate Property.

ALR ENGINEERING, INC

7141 N. VIA VENEZIA

Tucson, Arizona 85704

WE ARE alrengineeringinc.com

X

19930 | A19930 19941 | A19941

CONTACT US!



















SITEMAP

  • HOME
  • ABOUT +
  • ABOUT
  • OUR TEAM
  • CONTACT
  • FAQS
  • GALLERY
  • PROJECTS
  • SERVICES
  • WHY CHOOSE US?
  • Privacy | Terms & Conditions | Licenses

    Website Design & SEO by Enerjoust, LLC a High Tech Digital Marketing Agency 2023